CFA piling adjacent to a converted Victorian police station
CFA piling beside a converted Victorian police station, with works already underway and legal action looming.


We acted as the Building Owner's surveyor on a substantial construction project in Buckinghamshire. The proposals included continuous flight auger piling to form a retaining wall immediately adjacent to a former Victorian police station that had been converted into residential flats. Some works had already commenced before the Party Wall process had been concluded, which caused significant concern among the adjoining freeholder and leaseholders, who had begun considering formal legal action.
We treated the matter as a priority and liaised directly with the Adjoining Owner's appointed surveyor. We arranged the necessary inspections, reviewed the relevant technical information, method and risk assessments, geotechnical information and specifications, and ensured that the required Party Wall documentation was prepared and served. We also communicated with the affected owners to explain the proposed works, the safeguards being implemented and the procedures available should any damage occur.
The concerns of the adjoining owners were addressed, the dispute was brought back within the appropriate Party Wall framework and the necessary documentation was completed to enable the project to proceed with suitable protections in place.